Project Role:
Teleo Engineering gathered data on the costing to upgrade or double the plant in size with accurate data. This data was on the evaluation of the processing plants current plant condition and capabilities, this was used to forecast the plants increase capacitys. This included sourcing local suppliers in Armenia and Russia for new equipment upgrades and maintenance requirements. Plant and equipment was also required to be surveyed for engineering input in Brisbane, Austrlia.
Teleo Engineering reported to Xstrata with daily and weekly progress reports and represted Xstrata at the clients site in technical and social related issues.
Teleo Engineering successfully and accurately collected the required data for the client to put a business proposal forward for funding. The client offered Teleo Engineering the opportunity to project manage the project onsite, however, this was declined. The client is currently executing this project.
Project Assignment:
Zod Gold Mine, Devalu, Ararat, Armenia
Teleo Engineering completed onsite data collection to input data into a bankable feasibility study for the upgrade of the plant to double the current capacity and for this data to be used to get funding. This included completing a site inspection of all mechanical, electrical and structural requirements of the processing plant.